User Tools

Site Tools


2008:loge_sept_2008

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
2008:loge_sept_2008 [2008/09/28 15:32] tomgee2008:loge_sept_2008 [2008/12/02 10:39] (current) tomgee
Line 25: Line 25:
 Strategy is to hang the heater from the bench bottom blowing into the FanJet in front of the heater. The FanJet is also hanging from the bench bottom. Strategy is to hang the heater from the bench bottom blowing into the FanJet in front of the heater. The FanJet is also hanging from the bench bottom.
  
 +
 +===== Implementation =====
 +LOGE was made operational on Dec 1, 2008. A pushbutton was mounted on the LOGE housing to "blink out" the outside and inside temperatures. The temp thresholds were set to 39 and 23 for furnace selection. Work was begun on Dec 2 to design a packet radio link to send the data and alarms.
2008/loge_sept_2008.1222630323.txt.gz · Last modified: 2008/09/28 15:32 by tomgee