events:knightsbridge_circle_timeline
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
events:knightsbridge_circle_timeline [2022/12/17 16:09] – [2018] 192.168.1.21 | events:knightsbridge_circle_timeline [2022/12/17 16:13] (current) – 192.168.1.21 | ||
---|---|---|---|
Line 5: | Line 5: | ||
|Nov 8|George Condon death, Knightsbridge Circle first time Walk Through| | |Nov 8|George Condon death, Knightsbridge Circle first time Walk Through| | ||
|Nov 9|Put in offer for Knightsbridge| | |Nov 9|Put in offer for Knightsbridge| | ||
+ | |Nov 10|Knightsbridge house offer was countered, we accepted| | ||
|Dec 9|Final walk through 12:30| | |Dec 9|Final walk through 12:30| | ||
|Dec 10|Knightsbridge Closing 10AM. Lowes trip for gardening tools, Christmas Tree, Palm Tree LEDs | | |Dec 10|Knightsbridge Closing 10AM. Lowes trip for gardening tools, Christmas Tree, Palm Tree LEDs | | ||
Line 12: | Line 13: | ||
|Dec 15|Purchase Lowes miter saw, cut extensions for kitchen cabinet to accommodate dishes| | |Dec 15|Purchase Lowes miter saw, cut extensions for kitchen cabinet to accommodate dishes| | ||
|Dec 28 |Trenched cable along foundation for hot tub. Hot Tub delivered 1 PM| | |Dec 28 |Trenched cable along foundation for hot tub. Hot Tub delivered 1 PM| | ||
- | |Dec 29| Finished wiring and powered Hot Tub| | + | |Dec 29| Finished wiring and powered |
events/knightsbridge_circle_timeline.1671311385.txt.gz · Last modified: 2022/12/17 16:09 by 192.168.1.21