plumbing, WCPE, Tesla
Sunday, October 5, 2008, 06:00 PM
After the Sunday newspaper routine I went to Home Depot to pick up a copper tee for the spigot plumbing. Cut the pipes and soldered the tee to the line and mounted a block of wood to fasten the end of the 1/2" pipe against. The spigot is pretty firm and stands 6 inches above the sink. It took a few hours to accomplish but it turned out well. After a lean Cuisine lunch of sezchuan shrimp we went to the WCPE open house in Rolesville. We have never been there before. Walked around the studio, had birthday cake then toured the transmitter and generator building. It was pretty comprehensive. I took lots of pictures of the music collection, offices and inside the transmitter building. We came back via I-540 and the 64 bypass to the beltline. It was an easy trip back. Libbie made her excellent pizza and I watched a 60 minutes story about the electric car revival featuring the GM Volt and the Tesla motor company sports car.
  |     |  
( 0 / 0 )