septic, wiring, BBQ chicken
Friday, February 27, 2009, 06:00 PM
I went outside around 9 and started working on the septic pump. After installing the 2 inch pipe and taping the wiring to the pipe I hooked up the rope and lowered it into the tank. It went in a lot easier than I thought. Installed a 220 VAC outlet by the tank and rewired the panel in the garage but I made an error picking up the same phase for both sides of the 220 VAC. After a quick change to pick up both sides i tried again but the punp was stalled. I could hear it humming but it didn't pump. I initially thought the line was plugged so I dug a hole 100 feet up the hill and drilled a 1/4 inch hole but no water. Went further down and dug another hole about 30 feet up the pipe. Drilled another hole and also dry. Cut the pipe at the creek and tried the pump again. This was when i realized the pump was stalled and not pumping. I will have to raise it again and get it to spin freely. Dinner was Libbie's barbecued chicken with Southwestern corn. Her BBQ sauce is still good. Libbie has a bad cough today. I'll probably get it tomorrow.
  |     |  
( 0 / 0 )