gas lines
Saturday, April 24, 2010, 06:00 PM
Shut the gas off and disassembled the lines going to the furnace and water heater. Installing the new lines went pretty good except I needed a new appliance connection fitting and another 2 inch x 3/4 inch pipe nipple. Got everything hooked up and tested the gas with soap bubbles and discovered the union was leaking even though this wasn't even disassembled. Took it apart and painted the threads with pipe sealant and tightened everything up again. This time it was leak free. When Libbie came home we listened to the Met Tosca while having lunch on the back porch. We had the leftover beef from last night. During the Met intermission we took a walk in the back. They started lot 68 and were painting and trimming several others. We're almost completely blocked in by homes except for the two ponds. For dinner tonight we ordered Chinese Szechuan which we had with Trader Joe Chardonnay. I finished the AVSA 2010 accounting and sent the spreadsheet off to Brenda, IRwin and Kathy. Still need to audit it. |
| ( 0 / 0 )