ductwork
Saturday, June 25, 2011, 06:00 PM
Went into the attic this morning and implemented the permanent fix for the hole in the duct. Cut a piece of metal and caulked then screwed it onto the ductwork. Next step was to tape the seams with aluminum duct tape and then cover everything with aluminum faced self stick insulation. Finished in the attic for now. One thin i noticed, after the A/C stops the ducts still have cold air in them. The room temp was 81 and I turned the fan to on and measured the air temp. It was 74. I need to run the fan a little longer after the compressor turns off. Possibly I need to measure the delta difference between the room and the ducts and use that. Dinner was vegetable lasagna followed by a Klondike bar. In the PM I went to the greenhouse and finished taking apart the fallen bench. Started cleaning up the 2x4's as well by pulling nails. Got about half of them done.
  |     |  