carpet
Thursday, September 26, 2013, 06:00 PM
The carpet people called around 9:30 and arrived around 10 am. It was pouring rain when they arrived but soon the sun came out. A very thin husband and wife team did the whole thing - moved the furniture, pulled out the carpeting, installed the new stuff. It took all day. Dan lent me his hand truck so I was able to get the glass top of the dining room table to the dumpster. Good riddance. Now I have to take care of the 6 chairs. The carpet job took all day, they left at 4. I called over the clubhouse and got a full rack of ribs for two nights. I ate the salad, baked potato, roll and half the rack with a glass of Ravenwood Cabernet. Very nice. HAd to put the condo back together which was not bad.
  |     |  
( 0 / 0 )