scramble
Sunday, April 27, 2014, 06:00 PM
After the morning shows I went outside and worked on finishing up the Fascia boards. Got the remaining boards installed on the rear cornice and caulked everything. Now I have to tackle the upper greenhouse roof fascia and check the fascia boards all the way on top. Next step was to run the conduit and wires from the knee wall to where the cameras come into the garage. Got everything wired up and working. I discovered I had a junction box in the knee wall with a feed in it from the breaker panel labeled Tom's Office. This apparently was destined for me to install a dedicated power line to the office area but has not been implemented yet. Lucky the power was there!!! While running power I also ran an Ethernet line to the garage corner from the knee wall which will eventually go to my switch in the office closet. I also ran two lines for the telephone from the crawl space to the knee wall. A very full day. We had a visitor this afternoon who is moving into this area from NY City. Her husband died so she sold her NY apartment and has the house in Carolina Trace and also a house in VT. Libbie had to run out for flour for the pizza. I was too tired to do this. Dinner was her very nice pizza. I packed a suitcase tonight in prep for my drive tomorrow. |
| ( 0 / 0 )