digging
Thursday, October 8, 2015, 06:00 PM
Built the new septic lid this morning then dug out the rest of the 2 inch septic line. Cut it open with the Sawzall and found the blockage is in the upper section of the pipe, sewage flows OK from the pump to this point which is about 50 feet up from the pump. Poured some draino down the pipe to try to clear it and then Libbie and I carried 2 pails of water up the hill and poured it down the line as well. I think it trickles out, she thinks differently. Did not put the y fitting in tonight. For dinner I made chicken filets with pesto and slices of Roma covered with Mozzarella. We had a bottle of Shiraz to complement the meal. Late in the afternoon we picked up the check from Annes real estate office and signed a form. Tonight was the season opener of Tanhauser. I love that opera. Hopefully I got it recorded in my office on the small multimedia computer. |
| ( 0 / 0 )