Monday, June 20, 2016, 06:00 PM
I worked outside in the greenhouse on both the outdoor water spigot and the electrical conduit. The water is complete but not tied in to the main line. The electrical job needs some wood around the outlet to staple plastic to and also needs a hole in the foundation to tie it to the house wiring. I'm on a liquid diet today so i only had a bowl of french onion soup but without the onions. I started the prep today at 4 but had great difficulty getting the liquid down. I spent 6 hours and only got less than half the liter bottle of prep down. I kept gagging on the stuff. One of the issues was the amount of liquid. I had too much to drink today with soda and iced tea mix as well as the soup so i couldn't take any more liquid. I finally gave up around 11 PM and went to bed. |
| ( 0 / 0 )