sheetrock
Wednesday, July 5, 2017, 06:00 PM
Libbie went out walking with Anita and i worked in the garage on patching the ventilation holes in the sheetrock for the crawl space. I have 2 rectangles cut each 8" high by 16" wide. I'll have to cut another 2 inches wider all around to nail a piece of sheetrock over it. I finally decided to make the cut all the way to the corner and just put in one longer piece. This will involve a trip to Lowes with the trailer. I tried some more, several times, to get the correct note to come out for the B in the C Major scale. I did only twice I think but it was a real effort to get the note to come out. Wow, difficult.
Dinner was spaghetti with cheese. The hot tub pressure switch needs adjusting but when I took the wires off the switch the terminal broke off the switch. Now I need to replace the switch. I found the old switch and with luck I can salvage the old micro switch mounted on top of the switch. I drilled the rivets out of the old switch successfully. Now I need to do this on the existing switch so I can replace the microswitch. This may work well. As a backup I ordered a new switch from Arizona. I need a 1/8 NPT brass plug which Lowes sells so I can block the hole while I rebuild the switch. I used to have one of these but the baggie where it's supposed to be in is empty.
|
| ( 0 / 0 )