Lighting
Friday, July 28, 2017, 06:00 PM
I continued the lighting project this morning. It's warm and very humid outside but I got 5 more lights hooked up. In addition, I moved a wheel barrow of dirt into the tire tracks that the Crawl Space construction crew made in front of the Red Bud on the turn around. Next major piece of landscaping is to move the bayberry bushes back where they are leaning over in front of the big pine and tie them up. I want to install another light here facing the pine.
I finished the lighting but had sever cramps in my hand. Libbie said it was dehydration and google agreed. I drank plenty of water in the evening and also bought some bananas at Kroger to combat the cramps. For dinner we had hamburgers before going to the studio for dance. I danced with the blonde Lisa who is a very good dancer. Not sure what her story is. After the dance we went out to MacGregor Tavern for fully loaded nachos and a Yuengling. Accompanying us were the Hyghs and the Kretchmans. Anita starts work on Monday. I programmed my last Sonoff module and installed it in the garage hooked up to the new power transformer for the Driveway West Lights. I had to modify the power controller since it had a digital timer that did not turn on when you first plugged it in. This was not acceptable since I need to use the Sonoff to power the device on and off. In it's current configuration when the Sonoff would apply power the controller won't turn on. I completely removed the digital timer making the unit a power transformer only. We left for dance at 8 PM and sunset was 8:25 so we didn;t see the lights until we got home. I was thrilled they were all on and mostly aimed correctly. I adjusted the one on the Redbud at the turnaround to aim higher.
  |     |  
( 0 / 0 )