attic entryway
Thursday, September 28, 2017, 06:00 PM
Went to Lowes this morning and bought the trim for the office as well as a stack of stair treads and some 1x4. I'll paint all this before installing. i put down the underlayment in both the attic entrance and the closet. I cut both door jambs for both doors and then laid the floor down in the attic entry. This completed my activities for the day. While at Lowes I also got two 100 watt LED bulbs for the attic because the old incadescent bulbs finally burned out. They may have been the originals from when the house was built. There is one incadescent bulb left. Should have bought a third LED but they come in 2 packs. Not sure where I would use the extra 100 watt bulb. I also bought a 3 outlet outdoor cube tap for my extension cord. This really works well since I can plug all my power tools in while working outdoors. This includes the jigsaw, the Skil saw and the miter saw. I used all three while putting down the attic entryway. Lunch today was the leftover Lloyds BBQ in a pita. For dinner I had Southern Fried chicken from Kroger along with a Shiner Bock Beer. We have one more excellent tomato leftover on the window sill. I need to figure out what to use it for. I may make a chicken and tomato sandwich tomorrow. The tuner came today. It seems to be all over the place trying to play a note. i was hoping it would be able to allow me to tune notes better with my emboruchere. So far no deal.
  |     |  
( 0 / 0 )