water
Thursday, December 28, 2017, 06:00 PM
I continued working on the water line and got the new solenoid installed and the water line run along the hot tub. The water line is fastened to the brick wall by drilling some 3/16 holes and using a masonry fastener and conduit clamp every few feet. The run to the other side of the porch was trickier. I used a tee at the pressure reducer just past the solenoid and sent a roll of tubing down through the hole in the floor hooked to the tee. The crappy job was crawling on hands and knees to the roll under the porch. Just as I got to the other end Libbie called and said Christa was on the phone. I continued unrolling the tubing and fastening it to the existing water line along the length of the porch. I pushed the tubing up through the other hole in the floor then came in to talk to Christa. She agreed to shift the vacation dates back one day to accommodate our host. After the phone conversation I booked the penthouse condo with the new dates. On the porch I'm pretty happy with the construction work so far but I still have more to do. Dinner was spaghetti with meatballs and cheese.
Before dinner i started digitizing another of Dad's films. This time it was graduations. I did not finish this roll, will continue tomorrow.
|
| ( 0 / 0 )